Independent Power Producer (IPP)
Identification of failure causes of lead batteries in photovoltaic plants (UPS)
Throughout the project, Bcare analyzed the characteristics of the installation and the batteries used, reviewing the parameters of use, environmental conditions, recorded variables and the mode of use of the batteries, in order to finally identify the causes of premature battery failure.
Fill out the following form with information about your project and we will contact you as soon as possible.